Abstract
This document is about Wind on the Wires: Providing Grid Access to Renewable
Energy
Table of Contents
- Table of Contents
- Energy Insights Opinion
- In This Report
- Situation Overview
- Lagging U.S. Grid Investment
- Figure: U.S. and U.K. Normalized High-Voltage Transmission Capital Investment Levels, 1999-2003 and 2004-2008
- Table: Wind Energy Penetration in Europe and the United States, 2006
- Figure: Conceptual 765kV Backbone System for Wind Resource Integration
- Figure: Proposed Large-Scale U.S. Transmission Plans
- Transmission and Wind Energy Access Hang-Ups
- Which Comes First: Generation or Transmission?
- Lengthy Planning Processes, Mismatched Build Times
- Grid Interconnection Proximate to Load Centers
- Intermittency Concerns
- Queue Delays
- Unstable Policy Support
- The Approach
- Wind Integration Studies: Results Encouraging
- Table: Key Results from Major Wind Integration Studies, 2003-2006
- Federal Actions
- Federal Energy Regulatory Commission Rulings
- Conditional Firm Transmission Service
- National Interest Electric Transmission Corridors
- Renewable Transmission Bonds: Potential Funding for Public Power Companies
- Regional Initiatives
- Regional Transmission Planning Efforts
- Area Control Error Diversity Interchange
- Figure: Proposed Large-Scale U.S. Transmission Plans
- Technical Innovation
- Case Studies: Linking State RPSs with Comprehensive Transmission Planning
- Texas: Competitive Renewable Energy Zones
- California: Wholesale Transmission Tariff
- Colorado: Following Texas with Energy Resource Zones
- Figure: The High Plains Express Project
- Minnesota: RPS Framework
- New Mexico: Renewable Energy Transmission Authority
- Figure: State Transmission Authorities
- Future Outlook
- Essential Guidance
- Learn More
- Related Research
- Energy Insights Research
- Other Research
- Synopsis